Anesthesia – Infrastructure

Infrastructure of the Department

  • Fourteen fully functional operation theatres with 6 Workstations
  • Laminar flow with HEPA filters in all operation theatres
  • Well-furnished library
  • 24 hour Internet facility
  • Demo hall with 42 inches LED TV
  • Museum
  • Well-equipped preoperative rooms
  • Well equipped recovery rooms with ventilators
  • Fibreoptic Intubation Bronchoscope